Tule River Success Lake Spillway Enlargement Phase 2
BID DATE
07/16/21 - 11:00
AGENCY
Department Defense
ESTIMATE
$50,000,000
SCOPE
The project generally consists of constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success lake spillway and constructing side walls and downstream Apron. The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors. Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks. Rock slope protection will be added to Frazier Dike and other areas around the lake. https://sam.gov/opp/cb481faeb9e14eb88976e90d0ec95c3e/view vernon.simpkins@usace.army.mil