Access the Full Project by Clicking here!
Bidjugde
JOB
Taxiway W Rehabilitation
BID DATE
06/16/21 - 7:00 REAL-TIME
AGENCY
PMGAA
ESTIMATE
n/a
SCOPE
The Taxiway W Rehabilitation project at Phoenix-Mesa Gateway Airport (PMGA) is intended to address the existing pavement distresses and failing pavement areas that were identified as part of a previous Pavement Inspection and subsequent Report. To mitigate the existing issues previously identified, it has been determined that portions of the existing Taxiway W pavements (a section at the south end of the taxiway, and a smaller section located near the Taxiway V intersection) will require full PCC panel replacements, and localized spall/patch/crack distresses will also be rehabilitated per the appropriate methodology, throughout Taxiway W, as shown in the Project Plans and details.
UPDATES