JOB
2020 2021 Street Overlay Reconstruction
BID DATE
07/22/21 - 3:30
AGENCY
Rialto
ESTIMATE
$700,000
SCOPE
The Work comprises the furnishing all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curb ramps, curbs, gutters, cross-gutters, driveways, and sidewalk; cold milling; crack sealing; full depth AC reconstruction in failed areas, reconstruction; asphalt concrete base course; full depth reclamation-cement; cold central plant recycling; asphalt rubber hot mix (ARHM) surface course; and adjustment of surface utilities to grade. The work also includes traffic striping and pavement markings, replacement of affected traffic signal detector loops, and all associated work as identified on the construction drawings. https://pbsystem.planetbids.com/portal/28159/bo/bo-detail/83979 Jeff Schafer 909-820-2531 jschafer@rialtoca.gov
UPDATES