21 13 Walden Storm Drain
BID DATE
06/30/21 - 3:00
AGENCY
Murray
ESTIMATE
n/a
SCOPE
This project will involve: the installation of roughly 1,560 feet of 36-inch RCP storm drain pipe including manholes; the construction of an outfall to the Jordan River including a concrete collar and the installation of rip rap; and the installation of an ADS stormwater treatment system. Chris Zawislak +1 801-270-2433 czawislak@murray.utah.gov