Halik Street Paving Drainage Water Line Sanitary Sewer Improvements
BID DATE
06/17/21 - 2:00
AGENCY
Pearland
ESTIMATE
n/a
SCOPE
City of Pearland is accepting bids for the reconstruction of Halik Road, including: removal of exist-ing asphalt and concrete pavement, placement of 8” jointed, reinforced concrete pavement with 6” concrete curbs, lime stabilized subgrade, 6’ concrete sidewalk, and 2’ brick pavers back of curb; 24” and 30” reinforced concrete pipe and 5’x4’ reinforced concrete box, curb inlets, manholes, and junction boxes; and 1,027 feet of 8” PVC waterline with fire hydrants, fittings, valves, and connections and abandonment of existing water line. https://pearland.ionwave.net/PublicDetail.aspx?bidID=1490&ret=OPEN&pg=0&bidNumber=&title=&type=&org= ebids@pearlandtx.gov
PREBID
6/10/2021 11:00