Access the Full Project by Clicking here!
Bidjugde
JOB
Extend Reclaimed Water Main Los Coyotes Diagonal Camp Shiwaka
BID DATE
07/9/14 - 10:00
AGENCY
Long Beach
ESTIMATE
$300,000
SCOPE
The Work consists, in general, of the construction of approximately 550 linear feet of 6-inch diameter ductile iron main, a 2-inch Reclaimed Water Service at Camp Shiwaka for Irrigation per LBWD Std. Dwg. WDS-001 excluding meters. The work includes connection to an existing 20-inch CML&C pipeline at Parkcrest Street. Valeri Karakanov - 562-570-2331 Valeri.Karakanov@lbwater.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT