SCOPE
Construction of approximately 165 linear feet of curb and gutter, 875 square feet of 3”/8” asphalt concrete pavement, 600 square feet of concrete sidewalk, 750 square feet of concrete driveway approaches, (2) asphalt driveways and (1) UTBC driveway.  Installation of a 72” storm drain dry well  Modification of an existing irrigation clean‐out box  Relocation of water meters and valves  Edge roto‐mill and 2” mill  Placement of 2” overlay of approximately 46,000 square feet on 13200 South, 150,000 square feet on Park Avenue, 7,300 square feet on the Oquirrh Park parking lot, and 20,000 square feet on the Rose Creek Trail.  Adjust/raise utilities to grade  Re‐striping of roads  Other items as specified bid.submittal@rivertoncity.com https://www.rivertonutah.gov/bid_detail_T15_R114.php