Access the Full Project by Clicking here!
Bidjugde
JOB
Secondary Sewer Renewal Program SSRP DCON 01 P02
BID DATE
07/28/21 - 10:00
AGENCY
Los Angeles
ESTIMATE
$5,073,691
SCOPE
In Lincoln Hts Planning Area: Repair/rehab ~ 20,296 reach-ft (3.84 reach-mi) of structural/ "D" condition swrs Bounds: N: 10 Fwy S: 5, 60, & 101 Fwys E: Evergreen Ave W: 101 Fwy •Spot rpr 804 reach ft of 6-inch pipes (40 actual ft) •R&R, spot rpr and/or lining of: 18,553 reach-ft of 8-in pipes (12,884 actual ft) 122 reach-ft of 10-in pipes ( 118 actual ft) 404 reach-ft of 12-in pipes ( 400 actual ft) 413 reach-ft of 15-in pipes ( 201 actual ft) •Install 9 MHs, Remodel 14 MH Bases •Remove 6 Flush Tank Mechanisms •Install 32 HC Seals Also: traffic ctrl, trenching, sewer by-pass, sewer cleaning, sewer CCTV, temp st resurfacing, final pavement See bid package for full scope & details Bid package only on BAVN- download Part 1 to be a planholder For Planholders Lists & Bid Results, visit http://eng.lacity.org/contractors/ mary.thomas@lacity.org
PREBID
6/10/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT