Access the Full Project by Clicking here!
Bidjugde
JOB
CD2 Improvements Kardon Park
BID DATE
07/9/21 - 2:00
AGENCY
Driftwood Conservation District
ESTIMATE
$580,000
SCOPE
The scope of work shall include, but is not limited to the labor, materials, equipment, and incidentals to expand the existing parking lot, provide new utility connections, new premanufactured restroom, lighting, a dog park, and other site furnishings. Services shall be provided as indicated to include site construction, general construction, and electrical work for parking lot expansion, site lighting, prefabricated restroom, dog park fencing, dog and human drinking fountain, benches, trash receptacles, concrete paving, signage, water and sewer extension and two shade canopies. Alternate construction includes a pair of shade canopies at picnic nodes, a shade canopy at the exercise node, and a pair of shade canopies at the dog park. Background: The Lou Kardon Park is in City Council District 2 just north of Gibbs – Sprawl Road and south of Rittiman Creek. The park’s amenities include a parking lot, portable restroom enclosure, shaded playground, an exercise equipment node with Health Beat equipment, several baseball fields, and a .56-mile paved walking trail. This project will expand the parking lot pavement areas, provide security lighting, extend water and sewer into the park to supply utilities to a premanufactured restroom, add a dog park with associated amenities and shade over several existing picnic table areas. https://www.civcastusa.com/project/60afc75e5ed0871b93e00e39/summary desiree.alderete@sanantonio.gov
UPDATES