Access the Full Project by Clicking here!
Bidjugde
JOB
Surface Water Distribution System Improvements
BID DATE
07/15/21 - 2:00
AGENCY
Turlock
ESTIMATE
$35,700,000
SCOPE
The Project consists of constructing a 2.3 million gallon concrete tank, 12 million gallon per day pump station and building, detention basin and storm water pump station, 12,000 linear feet of 16-inch to 54-inch diameter potable water pipeline and appurtenances, 2,500 linear feet of 15-inch storm drain pipeline and manholes, three pressure reducing valve vaults, pavement improvements, associated grading, structural mechanical, electrical, and instrumentation equipment, and all work necessary to provide a complete and operational facility. engineering@turlock.ca.us
PREBID
6/16/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT