JOB
Tamarron 16 inch Water Line
BID DATE
06/10/21 - 2:00
AGENCY
DR Horton
ESTIMATE
$1,500,000
SCOPE
The Work associated with this Project consists of construction of approximately 8,000 LF of 16-inch diameter water line and all necessary appurtenances by open-cut or trenchless construction methods from just south of the intersection of Fulshear Drive and FM 359 to the proposed location of the Tamarron West Water Plant. The majority of the work is to be performed within TXDOT right-of-way. Open-cut construction is to be performed primarily parallel to FM 359 and Jordan Road. Trenchless construction is required underneath FM 359 as well as underneath other roadways and driveways. In addition, Work for this Project includes approximately 1,300 LF of access road including all appurtenances as necessary. Please direct all questions related to the design of the Project to the Q&A Section. https://www.civcastusa.com/project/60b15789eeabec4e574e852b/summary jsj@freese.com
PREBID
6/7/2021 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT