Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Fire Flow Improvement
BID DATE
06/9/21 - 2:00
AGENCY
Sonoma
ESTIMATE
$583,800
SCOPE
In general, the project includes the installation of new 8” or 10” water mains in portions of Junipero Serra Drive, Broadway, and Denmark Street, replacement of water services, and installation of fire hydrants on existing lines in Denmark Street, 2nd St East, and W. Spain St. Proposed activities include sawcutting and demolition of existing hot mix asphalt pavement and other surface materials, including surface concrete facilities, trench excavation, abandonment of portions of existing water mains, installation of new water mains including all new fittings, gate valves, air release valves, connections to existing water mains, reconnection of existing water services, backfill and compaction, surface restoration, including hot mix asphalt paving and slurry seal, concrete sidewalk, driveway and/or curb and gutter, traffic control, and other related work, as set forth on the project Plans and Specifications. https://www.bpxplanroom.com/jobs/498/details/2020-fire-flow-improvement-project-no-1905 kat.harvey@ghd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT