Access the Full Project by Clicking here!
Bidjugde
JOB
Conrad Street Sewer Replacement
BID DATE
06/17/21 - 2:00
AGENCY
Placerville
ESTIMATE
$400,000
SCOPE
Construction and completion of approximately 201 LF of new 6-inch SDR-26 sewer main, 360 LF of remove and replace 6-inch SDR-26 sewer main, 9 sewer service connections, 1 lower lateral and cleanout replacement, 5 48-inch sewer manholes, 1 outside drop connection, remove 212 LF of existing 4-inch sewer main, abandonment of existing 6-inch sewer main, and the removal of a 36-inch oak tree. Work includes, but is not limited to: soil excavation, rock excavation, backfilling and compaction, concrete, pipefitting, pipe abandonment, manhole removal and replacement, connections to existing City facilities, site restoration, patch paving and trench paving, sewer bypass pumping, tree removal, and all other work required in the Contract drawings. https://qap.questcdn.com/qap/projects/prj_browse/ipp_browse_grid.html?projType=all&provider=2508839&group=2508839 cschiestel@cityofplacerville.org
PREBID
6/3/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT