Access the Full Project by Clicking here!
Bidjugde
JOB
Sacaton Flats Subdivision
BID DATE
06/18/14 - 10:00
AGENCY
GRIC
ESTIMATE
$2,000,000
SCOPE
Work includes construction of 19,800LF of 16” PVC water main from an existing stub out at the intersection of State Route 87 and Tadai Street in District 2, southeast along State Route 87 then east along Blackwater School Road to an existing water main in Blackwater School Road in District 1. The work also includes the installation of (16) 16” Resilient Wedge Gate Valves, (15) Fire Hydrant Assemblies and all other related appurtenances. Work includes all required fittings, plugs and appurtenances, testing and approvals, as required by plans and specifications. Phase III The transmission main work includes construction of 6,070LF of 12-inch C-900 PVC water main from an existing stub out on Mish Ki Road, north to the intersection of Mish Ki Road and Sacaton Flats Road, then west to approximately the site of the Sacaton Flats Booster Pump Station. This work also includes the construction of 135LF of 8-inch C-900 PVC water main and 30LF of 6-inch C-900 PVC water main. Work includes the installation of (13) 12-inch Resilient Wedge Gate Valves, (4) 8-inch Resilient Wedge Gate Valves, (2) 6-inch Resilient Wedge Gate Valves, (6) Fire Hydrant Assemblies, and (8) Air Release Valve Vault Assemblies. Work includes all required fittings, plugs and appurtenances, testing and approvals, as required by plans and specifications. The booster pump station work includes the demolition and removal of the existing Sacaton Flats Booster Pump Station and the installation of a new Sacaton Flats Booster Pump Station equipped with (2) 20-Hp Horizontal Split Case Pumps, Valving, Pressure Relief Line, Flow Meter and all related appurtenances. Work includes coordination with DPW to ensure continuous water delivery utilizing temporary, stand-by portable pumping units with required by-passes and interconnections as required during the abandonment of existing infrastructure and construction of new infrastructure. Work includes all required fittings, plugs and appurtenances, testing and approvals, as required by plans and specifications. Adriana Espinoza adriana.espinoza@gric.nsn.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT