Access the Full Project by Clicking here!
Bidjugde
JOB
Grand Canyon Airport Construction Runway Shoulders Drainage
BID DATE
06/17/21 - 3:00
AGENCY
ADOT
ESTIMATE
n/a
SCOPE
Excavation, Hauling and Processing of soils material required to construct runway and taxiway paved shoulders and other areas graded to the lines and elevations depicted on the plans. • Removal and reinstallation of existing runway and taxiway edge lights. • Removal of existing asbestos electrical conduit and installation of new conduit at TWY B. • Construction of 25-ft wide asphalt surface shoulders on RWY 3-21. • Construction of 20-ft wide asphalt surface shoulders on Taxiways A-G. • Crack sealing and application of a seal coat on RWY 3-21 and portions of Taxiways A-G. • Application of pavement markings on the runway and taxiways. • Removal of existing corrugated metal pipe cross drains and catch basins. • Installation of new reinforced concrete pipes, catch basins, manholes and concrete end sections. • Installation of pavement under drains adjacent Runway 3-21, Taxiway A-F and to a portion of Taxiway zplichta@azdot.gov
UPDATES