JOB
Orange Eagle Point Parkway Medical Center Drive Phase 1
BID DATE
06/9/21 - 10:00
AGENCY
Orange - TX
ESTIMATE
n/a
SCOPE
installation of subgrade lime stabilization, asphalt stabilized base, cement treated base, compacted select fill, storm inlets and HDPE storm lines, storm detention/retention holding ponds and outfall structures, cement treated base, 8-inch reinforced concrete pavement and curb, 9-inch continually reinforced concrete pavement and curb, water lines, sanitary sewer lines, and other associated work, traffic control signs & markings, erosion control devices, seeding, and performing site restoration and cleaning up the project for Eagle Point Parkway & Medical Center Drive Phase 1 within the City of Orange. Entire Project shall be completed within 180 total days. https://www.civcastusa.com/project/60aa83b2188f9f33b55457aa/summary dking@fittzshipman.com
PREBID
6/2/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT