Access the Full Project by Clicking here!
Bidjugde
JOB
Havasupai-Chaparral Washes Phase 5 - Chaparral Outfall
BID DATE
06/30/14 - 4:00
AGENCY
Bullhead
ESTIMATE
$285,000
SCOPE
The Project consists of the excavation and construction of a drainage outfall channel, the hauling, placement and compaction of the excess material in Rotary Park and the replacement of a portion of the existing asphaltic concrete multi-use path in Rotary Park. The project will require construction within the Chaparral Outfall and is considered waters of the United States. The United States Army Corps of Engineers has jurisdiction and a Permit has been granted for the project. The Contractor shall be responsible for complying with all requirements of the Permit. phone (928) 763-0128, fax (928) 763-0131 or mcoronel@bullheadcity.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT