Access the Full Project by Clicking here!
Bidjugde
JOB
Inglewood Ave Manhattan Beach Blvd Intersection Improvements Southbound Right Turn Lane
BID DATE
06/3/21 - 10:00
AGENCY
Redondo Beach
ESTIMATE
n/a
SCOPE
Work for this right turn lane addition project includes: demolition and disposal of abandoned utilities, remove and re-construct existing PCC and AC pavements; construct new PCC and AC pavements with base and sub-base; remove and reconstruct curb & gutter, and 3 curb ramps per approved Plans and Specifications; remove and re-construct PCC sidewalk, cross gutter, catch basin, storm drain lateral and Concrete Driveway. 2. Work also includes: remove and reconstruct traffic signal pull boxes; remove and reconstruct traffic signal poles, pedestrian push button, countdown ped heads, luminaires, mast arms, conduits, loop detectors and sign post; signing and striping; provide traffic control, utility coordination and any other work required per Plans and Specifications. planholders@redondo.org didar.khandker@redondo.org
PREBID
5/12/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT