5th Street Combined Sewer Improvements
BID DATE
06/2/21 - 2:00
AGENCY
Sacramento
ESTIMATE
$1,547,000
SCOPE
A. These Special Provisions cover, in general, the rehabilitation of the combined sewer facilities located between MH DD13-818 (intersection of 5th Street and S Street) and the wye upstream of CSMH EE13-225 (intersection of 5th Street and U Street). The work to be performed consists of: 1. Rehabilitating approximately 844.5 linear feet of the existing 60-inch combined sewer pipeline using cured-in-place pipe (CIPP). 2. Removing and replacing the cone of CSMHs EE13-212, EE13-211, and EE13 210 in order to install the CIPP. 3. Rehabilitating CSMHs DD13-818, EE13-212, EE13-205, EE13-211, and EE13-210 using epoxy lining. 4. Bypass pumping and traffic control as needed to complete the rehabilitation work. https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/82676 Philip Vulliet 916-808-5092 PVulliet@cityofsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT