Access the Full Project by Clicking here!
Bidjugde
JOB
Sewer Infrastructure Improvement
BID DATE
05/26/21 - 3:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
This advertisement will consist of two separate projects that will be bid and tracked separately but awarded together to the lowest responsive bidder. WR017 includes work at the Clark Farms/Tangerine and Clark Farms/Sandario intersections. WR018 Includes work at the Marana Road/Sanders Road intersection. WR017 – This Project entails the removal of three existing manholes and replacement with polymer manholes as detailed in plans. Two of the replacement manholes will include stop logs in the bases. A new 12” gravity main will be installed between both manholes at Clark Farms and Tangerine Farms. The removal of 80 LF of existing sewer line will also be included. WR018 – This Project entails the removal of four existing manholes and replacement with polymer manholes as detailed in plans. The removal of 237 LF of existing sewer and replacement with both 21” and 18” sewer as detailed in plans. This project will cross an existing irrigation canal that will be removed and replaced as part of the contract. Rudy Torres (520) 382-1983 rtorres@maranaaz.gov
UPDATES