4125 Zone Pumping Station
BID DATE
06/2/21 - 10:00
AGENCY
Las Vegas VWD
ESTIMATE
$12,880,119
SCOPE
The Site of the Work is located at the Contract No. 1472 Summerlin 3665 Zone Reservoir. The Work consists of constructing a 12.9 million gallon per day indoor pumping station, that has four vertical turbine pumps, a bypass line, a pressure reducing line, a compressed air system, electrical equipment, a restroom, janitor closet, top running bridge crane, valving and appurtenances. The Work also includes construction of suction piping, discharge piping for two pressure zones, surge tanks, and flow metering. Engineer's estimate: $12,880,119 Purchasing.HelpDesk@lvvwd.com