Access the Full Project by Clicking here!
Bidjugde
JOB
247th Avenue Road Improvements
BID DATE
06/19/14 - 4:00
AGENCY
Buckeye
ESTIMATE
$390,000
SCOPE
The nature of the work to be performed under this project shall consist of furnishing all labor, materials, equipment and services required to install approximately one thousand nine hundred forty (1,940) linear feet of new roadway. The southerly one hundred twelve (112) linear feet will vary from one hundred nine feet and nine inches (109’- 9”) to forty feet and zero inches (40’-0”) in width at the intersection connection with five (5) inches of Asphalt Concrete on twelve (12) inches of Aggregate Base Course, and the northerly one thousand eight hundred twenty seven and seven inches (1,827’- 7”) linear feet will vary from forty feet and zero inches (40’- 0”) to twenty four feet and zero inches (24’-0”) with three (3) inches of Asphalt Concrete on eight (8) inches of Aggregate Base Course, with a two inch to zero inch (2❠– 0”) Asphalt Concrete transition under the south end. 247th Avenue will include striping and signing of approximately one thousand nine hundred thirty nine and seven inches (1,939’- 7”) linear feet, inclusive of all grading, striping and signing, traffic control as noted on the Plans, pavement removal and replacement as necessary to complete the new roadway, including all applicable permits and approvals. The type, purpose and location of the proposed Project are generally described below and in more detail in the plans and special provisions. Special Provisions are made part of this IFB in Section 500. The Construction Budget is $390,000.00. cwilliams@buckeyeaz.gov or 623-349-6225 egilbert@buckeyeaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT