Colorado Lagoon Open Channel Phase 2A (REBID)
BID DATE
01/7/22 - 3:00
AGENCY
Long Beach
ESTIMATE
$20,000,000
SCOPE
CA Rasmussen - $21,859,840 Environmental Const. - $23,899,620 Sully Miller Contracting Co. - $24,240,000 Griffith Company (GMB) - $26,997,350 Reyes Construction - $27,365,150 Shimmick Construction - $27,490,000 ARB Inc - $32,924,400 The Work to be done consists of, but is not limited to, site clearing, site demolition, excavation, grading, sewer siphon construction, electrical duct bank relocation, other utility relocations and removals, pile installation, box culvert design and construction, cast-in-place retaining wall construction, roadway construction, concrete and decomposed granite flatwork, planting of native trees and vegetation, lawn sodding and seeding, irrigation, sports field construction, park amenities installation, traffic control, groundwater control, in-water work, all other work shown, and all incidental work. Bids are required for the entire Work. https://pbsystem.planetbids.com/portal/15810/bo/bo-detail/82818 Angelina Castellanos/562-570-6256, Anne Takii/562-570-6238 angelian.castellano@longbeach.gov , Anne.Takii@longbeach.gov
UPDATES