PFAS Treatment Systems
BID DATE
05/4/21 - 2:00
AGENCY
Orange County WD
ESTIMATE
$9,300,000
SCOPE
The City of Orange Wells 9, 19, 23, and 24 PFAS Treatment Systems project generally consists of the following major components: 1. Take delivery of and install District furnished Dual Media Pressure Vessel PFAS water treatment systems at four existing well sites including pressure testing, disinfection, and bacteria testing. 2. Take delivery of and install District furnished Ion Exchange resin into Dual Media Pressure Vessels. 3. Furnish and install prefilter systems for Ion Exchange (IX) systems including bag filters. 4. Water Treatment Plant Structural Concrete: Construct structural concrete for the water treatment systems. 5. Connect the water treatment systems to the existing wells and distribution systems: Furnish and install epoxy lined and epoxy coated above ground and cement mortar lined and asphaltic coated buried pipeline from the wells to the water treatment systems and from the water treatment systems to the distribution system points of connection. 6. Complete all Paving and Site Improvements including, but not limited to: Grading, Concrete Paving, Asphalt Paving, Fencing, and Drainage at the four well sites. 7. Electrical and Instrumentation: Furnish and install and/or modify electrical and instrumentation equipment and facilities at the well sites for the new water treatment systems. Instrumentation and control systems shall be integrated with the existing SCADA system.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT