Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2015 Pavement
BID DATE
06/5/14 - 2:00
AGENCY
Prescott
ESTIMATE
$1,000,000
SCOPE
The FY 2015 Pavement Preservation Project generally includes the construction of various pavement repairs and pavement resurfacing on Lee Boulevard, Gail Gardner Way, Sierry Peaks Drive, Old Black Canyon Highway, Vista Verde Estates, Cathedral Pines, Kingswood Estates, Whisper Ridge Road, and Shalimar Drive. The resurfacing includes multi-layer and single layer coats of rubber chip seals, microsurfacing, and slurry seal coats. The project includes the placement of a conventional asphalt chip seal coat on previously unpaved streets and alleys. The project includes the adjustment of utility covers to finish grade and the restoration of disturbed traffic striping. BID OPENING: June 5, 2014 at 2:00 PM MANDATORY PRE-BID MEETING: Wednesday, May 21, 2014 at 10:00 AM, City of Prescott Public Works Department. IN ORDER TO QUALIFY TO BID THE PROJECT AS A PRIME CONTRACTOR, ATTENDANCE IS REQUIRED AT THE MANDATORY PRE-BID MEETING.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT