2021B 09 Train Watch Park PRV Improvement (REBID)
BID DATE
11/18/21 - 2:00
AGENCY
Clearfield
ESTIMATE
n/a
SCOPE
SCI Inc - $211,679 Corrio Construction - $284,948 Mobilization; obtaining all bonds and insurance, removal of existing sod/landscaping, removal of existing water pipe lines; furnishing and installing one (1) 8-inch pressure reducing valve station with a 6-inch low-flow bypass line; constructing a concrete vault for the pressure reducing valve stations, furnishing and installing all pipe, fittings, gate valves, bends, connections and tees to complete each PRV station including conduits for power and communication; service pedestal; furnishing and installing all landscaping; and all appurtenant work in accordance with the Drawings and Specifications Wendy Page +801 (525) 2707 wendy.page@clearfieldcity.org