(CMAR) Concrete Pipe Gravity Sewer Rehab
BID DATE
09/1/22 - 11:00
AGENCY
Gilbert
ESTIMATE
$10,212,000
SCOPE
The scope of WW1060 is to rehabilitate 10,000 feet of 24” and 36” sewer pipe and 22 manholes. However, based on the anticipated repair/rehabilitation/replacement of the two adjacent critical pipelines, challenges in accessing the existing easement and planning for the future, a comprehensive analysis of this corridor will be completed. The primary objective of this task is to obtain a clearer picture of the condition of each pipeline that will enable us to further understand the urgency of repair/rehabilitation/replacement needed for each, and to look for opportunities to complete work on each facility in conjunction with the others. If determined to be cost-effective and feasible, we may be able to mitigate the impact through this corridor by combining the construction/repair/rehabilitation work for the three pipelines into one construction effort. PREBID: https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTliYTMzMmEtMTY4Ni00OTE4LWE4MmEtODFhYTRiMDM5MWE3%40thread.v2/0?context=%7b%22Tid%22%3a%222a562d2d-fcdc-4929-be1e-96860c5d7b0b%22%2c%22Oid%22%3a%22de5cac2b-5fbb-4904-b9d1-dbcd3288b6d4%22%7d
UPDATES