Adams St CR A99 Waterline Replacement
BID DATE
06/3/21 - 3:00
AGENCY
Clayton
ESTIMATE
n/a
SCOPE
The work shall generally consist of: Install approximately 1,320 linear feet of new 4-inch water main between Adams Street and CR A99 parallel to the existing water main with connections to the existing water mains; replace service lines at specified locations between new water main and existing meter; and abandon existing water main in place once new water main is disinfected, pressure tested, and in operation. kstearns@enganalytics.com