Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Damage Repair Redwood House Road
BID DATE
06/8/21 - 2:00
AGENCY
Humboldt County
ESTIMATE
$530,340
SCOPE
The work to be done consists of construction of temporary stream diversion, excavation and removal of existing pipe arch culvert, construction of arch culvert with concrete grade beam footings, placing rock slope protection, rebuilding the gravel roadway, and installing erosion control items. PWEngineering@co.humboldt.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT