Valley Ditch Phase 1 BNSF Railroad Drainage Improvements
BID DATE
07/9/21 - 2:00
AGENCY
Killeen
ESTIMATE
n/a
SCOPE
The Valley Ditch – BNSF Railroad Drainage Improvements project will include the installation of two (2) 84-inch diameter Class V Reinforced Concrete culverts or alternatively two 6’x6’ box culvert to increase the conveyance capacity of the BNSF culvert, construction of upstream/downstream headwalls and partial reconstruction of the west side of the downstream and upstream concrete lined channel. This scope of work is not intended to be inclusive of all work to be performed under this contract. Refer to the Project Manual, Specifications, and Drawings for further information. Prevailing wage rates have been established for this Project and are set out in the Project Manual. Such rates are a part of the Contract covering the Project. https://www.civcastusa.com/project/6090360b5c0d716a85c9c35c/summary solicitationquestions@killeentexas.gov