Access the Full Project by Clicking here!
Bidjugde
JOB
Chip Drive & London Bridge Road Pump Station Rehabilitation
BID DATE
05/6/14 - 2:00
AGENCY
Lake Havasu
ESTIMATE
$400,000
SCOPE
This project consists of the removal and replacement of existing discharge piping, valves, pipe supports and other appurtenances required to complete the work on two existing wastewater pump stations. LONDON BRIDGE ROAD PUMP STATION This station will require the removal and replacement of discharge piping at all three pumps. The check valves and plug valves to be replaced are only required at two of the three pumps. This station also requires a complete coating of the existing wet well which entails media and/or sand blasting of all walls, floor and ceiling including any concrete repairs prior to the application of the new coating. There is one additive alternate for this station. Alternate #1 is for the installation of three wet well hatch safety nets. Bypass pumping can be accomplished by diverting all flows to the Willow Wash Pump Station located at the same site for the duration of construction. CHIP DRIVE PUMP STATION This station will require the removal and replacement of discharge piping at all three pumps. The check valves to be replaced will be provided by the Lake Havasu City Wastewater Division. Bypass pumping will be the responsibility of the contractor for the duration of construction. This station has one alternate as well. Additive Alternate #2 includes the removal and installation of a new 10”MAG flow meter.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT