Access the Full Project by Clicking here!
Bidjugde
JOB
DNR Dead Horse Point State Park Yurt Access Roadway
BID DATE
05/13/21 - 3:00
AGENCY
State Utah
ESTIMATE
$260,000
SCOPE
Mobilization, 3-inch HMA, remove asphalt, sawcutting, excavation, untreated base course for road and shoulder, granular borrow, remove concrete, 4-inch concrete flatwork, 6-inch reinforced concrete flatwork, 6-inch curb wall, concrete parking block, 15-inch CSP corrugated metal pipe, 15-inch metal end section, pavement marking, sign, post and base. Tim Christensen +1 385-226-2422 timchristensen@utah.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT