JOB
Woodland Hills Waterline Replacement Phase 2A
BID DATE
05/8/21 - 2:00
AGENCY
Woodland Hills
ESTIMATE
n/a
SCOPE
This project includes installation of new 8-inch PVC C-900 to replace the existing 6-inch waterline. The project includes two schedules, either of both schedules may be awarded. Schedule A includes installing 825 linear feet of new 8-inch PVC-C-900 waterline on Maple Drive along with new service laterals, import backfill, fire hydrants, and connecting the existing system. Schedule B includes installing 715 linear feet of new 8-inch PVC-C-900 waterline on Settlement Drive along with new service laterals, import backfill fire hydrants, and connecting the existing system. Each schedule also includes milling and compacting the existing asphalt in place and installing 3-inches of new asphalt for the full road width. Project is in the city street rights-of-way of Woodland Hills, Utah. Chris Helvey +1 801-423-3900 chris@woodlandhills-ut.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT