FY 2021 2022 Pavement Rehab NIB 21 01
BID DATE
05/20/21 - 10:00
AGENCY
Agoura Hills
ESTIMATE
n/a
SCOPE
The work includes removal & replacement of Asphalt Concrete (AC) and Aggregate Base (AB), AC crack sealing, removal/replacement of existing speed humps, removal & replacement of ADA curb ramps, removal & replacement of one PCC bus pad at Dorothy Drive, lower & raise water valves and manholes, AC edge/full width grind, overlay with Asphalt Rubber Hot-Mix (ARHM), installation of Type 2 Slurry Seal, installation of traffic loops, and installation of pavement striping. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. https://pbsystem.planetbids.com/portal/39478/bo/bo-detail/82706 Robert Cortes rcortes@agourahillscity.org