Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) 22nd Street Bridge Union Pacific Railroad
BID DATE
12/14/21 - 3:00
AGENCY
Tucson
ESTIMATE
$55,000,000
SCOPE
This project will include reconstructing 22nd Street from Kino Parkway to Tucson Boulevard and replacing the existing 4-lane 22nd Street bridge that runs over Barraza-Aviation Parkway and the Union Pacific Railroad (UPRR) with a new 6-lane facility. The facility will consist of two 3-lane bridges, one for the eastbound travel direction and one for the westbound travel direction. A shared pedestrianbicycle bridge will be suspended in between the two new 22nd Street roadway bridges. In addition to the bridge components, improvements shall consist of retaining walls; asphaltic concrete and Portland cement concrete paving, concrete curb/curb and gutter, concrete barrier and sidewalk; a drainage channel, pipe culverts, storm drains, manholes, catch basins and associated inlet and outlet structures; street lighting; landscaping and irrigation; pavement marking and signing; traffic signal improvements at the Tucson Boulevard intersection; sewer modifications; water modifications, and other incidental work. The work shall also consist of relocating UPRR’s Water Treatment Plant. PREBID MTG: https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDlmMjU2ODQtYWYyZi00OWRjLThjZjAtNWZjMjQxM2M0MGFj%40thread.v2/0?context=%7b%22Tid%22%3a%22d21e59ec-c208-43eb-aaf1-cf06d9a196e0%22%2c%22Oid%22%3a%229236485a-e235-4796-b69f-4eec05422ed4%22%7d Dan.Longanecker@tucsonaz.gov
UPDATES