Access the Full Project by Clicking here!
Bidjugde
JOB
Measure B Group 3 Pavement Rehabilitation
BID DATE
05/18/21 - 2:00
AGENCY
Larkspur
ESTIMATE
$3,605,000
SCOPE
The work generally consists of mobilization; setup and maintenance of a traffic control system; developing and implementing a water pollution control program; cold planing, removing and disposing of existing pavement, concrete, aggregate base and native materials; roadway excavation; miscellaneous grading; installation of pavement fabric, paving mat, and subgrade enhancement geosynthetic; placement of hot mix asphalt (HMA) materials; pruning and removing tree roots under HMA repairs; constructing PCC valley gutters, sidewalk, curb and gutter; installing redwood header board; lowering and raising utility covers; replacement of traffic striping, pavement markings and roadside signs; installing shoulder backing; removing and replacing detector loops; cleanup of the project area and other items of work as shown in the contract documents. atan@cityoflarkspur.org https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={C90B6550-006F-437C-B5E9-AC71F358084D}&projectguid={091BB4BD-7E07-4B4C-AE3A-F71787A79FCE}

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT