Access the Full Project by Clicking here!
Bidjugde
JOB
North Atkinson Ave NM 256 Rehab
BID DATE
06/8/21 - 2:00 LIVE!
AGENCY
Roswell
ESTIMATE
n/a
SCOPE
The project will consist of the removal of approximately 3” of existing asphalt surfacing and 9” of excavation. It will be replaced with 6” of new base course and 6” of HMA SP-IV. The sidewalk will be repaired in various areas throughout the project and tied to the existing as well as building new sidewalk in areas where the sidewalk is missing. There will also have new permanent signing throughout. L.NAJAR@ROSWELL-NM.GOV L.EVERETT@ROSWELL-NM.GOV https://www.roswell-nm.gov/bids.aspx?bidID=113 BID OPENING: https://global.gotomeeting.com/join/848618933 Access Code: 848-618-933

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT