Access the Full Project by Clicking here!
Bidjugde
JOB
Martin Walker Elementary School Drainage Improvement Project
BID DATE
05/5/21 - 1:00
AGENCY
Copperas Cove
ESTIMATE
$73,000
SCOPE
The work includes all components associated with the drainage improvements through an underground storm drainage system and surface drainage elements, as illustrated in the plans. This includes the removal and disposal of existing pavement, the installation of approximately 400 linear feet of 18-inch HDPE storm drain pipes, 5 drainage area inlets, a curb inlet, a safety end treatment, approximately 60 linear feet of 6' wide drainage flume, a sidewalk trench drain, sidewalk repair, gabion baskets, grading, seeding, and erosion control. https://www.civcastusa.com/project/6086bf40edbec8f47acdaa11/summary mczipperlen@lan-inc.com
PREBID
4/30/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT