Access the Full Project by Clicking here!
Bidjugde
JOB
36 Inch Water Transmission Main From the State Highway No 3 Booster Pump Station to the South Shore
BID DATE
05/26/21 - 2:00
AGENCY
League City
ESTIMATE
n/a
SCOPE
The project includes furnishing, installing, and providing all labor and materials required to install approximately 17,730 linear feel of new 36-inch diameter potable water pipeline including approximately 9,660 linear feet of horizontal direction drill installation, approximately 1,995 linear feet of 36-inch diameter pipe inside 54-inch diameter steel casing installed by trenchless methods, and 6,075 linear feet of open cut installation plus valves, fittings, restraints, tree protection, erosion control, traffic control and all required appurtenances, including connections to the existing State Highway No. 3 Booster Pump Station and South Shore Harbour Booster Pump Station and incidentals required for the project. https://www.civcastusa.com/project/607e02ff5f67bce5cae8e9cd/summary chanslorkm@cdmsmith.com
UPDATES