Storm Water Improvement
BID DATE
05/5/21 - 2:30
AGENCY
Riverdale
ESTIMATE
$257,500
SCOPE
The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above projects; consisting of the following items of work: mobilization; removal of curb & gutter; removal of sidewalk; removal of waterways; removal of asphalt and roadbase; removal of concrete flat work, installation of catch basins, furnish & install approximately 210 feet of 15" RCP storm water pipe and approximately 16 feet of 18" RCP storm water pipe, installation of storm water manholes; regrade of road elevation as necessary; installation of curb & gutter, sidewalk, and handicap ramps; installation of roadbase and asphalt surfacing; restoration of landscaping, and all appurtenant work