Access the Full Project by Clicking here!
Bidjugde
JOB
Replace Water Control Structures 64 65
BID DATE
05/7/21 - 7:00
AGENCY
Department Interior
ESTIMATE
n/a
SCOPE
Contractor will provide all materials, equipment, labor and supervision to Replace Water Control Structure Unit 5 Drain (WCS 65) and 5C/GSL (WCS 64); including Cofferdams and Dewatering; Demolition Existing Concrete Walls; Rip-Rap and Bedding; Install Concrete Walls; Concrete Repair; Handrail and Grating; Install Water Control Gates. All work will be in accordance with the project specifications and drawings. https://beta.sam.gov/opp/c3b11af19d0045ea934c3df2634774e8/view?index=opp&page=1&keywords=&inactive_filter_values=false&opp_publish_date_filter_model=%7B%22timeSpan%22:%227%22%7D&date_filter_index=0¬ice_type=o&pop_state=UT
UPDATES