Kirby St Arbor Pkwy Water Main Replacement
BID DATE
05/11/21 - 2:00
AGENCY
Hemet
ESTIMATE
$250,000
SCOPE
The work generally consists of the replacement of the existing water mains under the Kirby St. And Arbor Pkwy. Water Main Replacement Project (CIP 5714). The work will include, but is not limited to, mobilization and demobilization, traffic control, trenching, bedding and backfill, water main replacement, trench restoration, final paving, striping replacement, storm water and erosion control, public notification, and other miscellaneous work https://pbsystem.planetbids.com/portal/39477/bo/bo-detail/82467 Lorena Rocha 951-765-2331 lrocha@hemetca.gov