Lucas Valley Rd MP 508 Curve Realignment
BID DATE
05/13/21 - 2:00 LIVE!
AGENCY
Marin County
ESTIMATE
$2,250,000
SCOPE
This project will install approximately 135 feet of retaining wall on the downhill side of the hairpin curve at mile post 5.08. The wall will consist of steel soldier piles, tie-backs and concrete lagging. The new wall location will allow for the horizontal realignment of Lucas Valley Road, increasing the horizontal curve radius from 44 feet (existing) to 65.5 feet (proposed). In addition to curve realignment, work will include a new roadway structural section including asphalt paving, aggregate base, concrete safety barriers, guardrail, culvert extension, arch culvert rehabilitation, concrete drop structure and rip rap for stormwater runoff energy dissipation, minor drainage improvements, upgraded traffic striping, signage and pavement markings, and traffic control. rcalvert@marincounty.org bids@marincounty.org ZOOM: https://marincounty-org-dpw.zoom.us/j/94276407229?pwd=VmdwWE1PVm56NzRyU1Q0d3k2cmhYdz09
PREBID
5/3/2021 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT