(CMAR) Northwest Water Reclamation Plant Process Improvements
BID DATE
09/24/21 - 5:00
AGENCY
Mesa
ESTIMATE
$26,000,000
SCOPE
SHORTLIST JULY 2021: Several plant process improvements at The Northwest Water Reclamation Plant (NWWRP) have been identified in the Design Concept Report (DCR) as needing to be upgraded. They are listed and detailed below. • Aeration basin upgrades • Headworks with grit removal system • Upgrade or replace effluent disinfection system • Critical building Uninterruptible Power Source (UPS) and Electrical Instrument and Control (EI&C) upgrades • Methanol system replacement • Programmable Logic Controller (PLC) upgrades donna.horn@mesaaz.gov