Peck Reservoir Booster Pump Replacement
BID DATE
05/29/14 - 2:00
AGENCY
Huntington Beach
ESTIMATE
n/a
SCOPE
 Work includes the furnishing and installation of four new vertical turbine pump assemblies to match existing. Contractor will reuse same discharge heads and base plates. Contractor is responsible for building pump assemblies to fit current station conditions (see attached drawing). Pumps are driven by Waukesha internal combustion engines. Only one pump can be taken out of service at any one time. Contractor will not be allowed to remove next pump until existing assembly has been fully tested and operational. Sharon Griffin sgriffin@surfcity-hb.org