Access the Full Project by Clicking here!
Bidjugde
JOB
Sewer Main Replacements Ocean Ave Locust Ave
BID DATE
05/18/21 - 2:00
AGENCY
Lompoc
ESTIMATE
$2,400,000
SCOPE
The 2014 Sewer Main Replacements at Ocean Avenue and Locust Avenue project includes, but is not necessarily limited to the following: Furnish and install temporary sewer services; pothole utilities; pavement saw cutting; structure excavation; special excavation in the Cultural Resources Overlay District; disposal of structure; install polyvinyl chloride pipe (P.V.C.) sanitary sewer; install fittings, maintenance holes, and sewer services; abandoning maintenance holes and sewer pipe sections; trench bedding and backfill; removal & disposal of existing concrete and asphalt concrete, furnish and construct Portland Cement Concrete (PCC) sidewalk, cross-gutter, and driveway; furnish and construct asphalt concrete trench paving and patching; clean-up and related work as required, to complete the work as specified by the Plans, Standard Specifications, City Standard Requirements, and these Special Provisions. https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={A75F25FF-FA57-4138-8695-81E87A65FDDD}&projectguid={CEFB6A06-4868-430D-8115-099D325EF304} s_meyer@ci.lompoc.ca.us
UPDATES