Access the Full Project by Clicking here!
Bidjugde
JOB
North Indio Flood Control Phase 2
BID DATE
08/18/21 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$65,000,000
SCOPE
Construction of 16,000 LF of channel improvements ( consisting of 2,500 LF of RCB culverts, 8,700 LF of concrete lined trapezoidal channels, 3,200 LF of rectangular concrete channels, and 1,600 LF of concrete channel transition structures). The RCB culverts have 3 to 6 cells with cell widths between 19' and 20' and heights between 8' and 1 7'. The work includes construction of 2 upstream inlets and 1 downstream outlet, which with concrete headwalls, wingwalls, aprons, buried side slope and scour protection. It also includes reconstruction and restoration of irrigation, landscaping, walkways, fencing, and other existing facilities. Also included in the project is the crossing of six existing public streets including Jefferson Ave, Ave 40, Ave 39, Ave 38 and Adams Street (2 locations). Work at these crossings will include construction of reinforced concrete box culverts, utility relocations, and street reconstruction. A traffic signal relocation is required for the crossing at Adams Street south of Ave 39. https://pbsystem.planetbids.com/portal/16339/bo/bo-detail/82232#bidInformation Tesfaye Demissie 760-398-2651 x2605 tdemissie@cvwd.org
UPDATES