Access the Full Project by Clicking here!
Bidjugde
JOB
Greenway Rd Heather Dr Roadway Improvements
BID DATE
05/11/21 - 4:00
AGENCY
Henderson
ESTIMATE
n/a
SCOPE
This project shall consist of, but not be limited to, the construction of general roadway improvements with the installation of asphalt concrete pavement, UTACS, curb, gutter, ADA curb ramps, sidewalk, conversion of three existing intersections from all ways stop controlled to roundabouts, updating streetlight luminaires, storm drain drop inlets, storm drain piping, storm drain manholes, conduits, pull boxes, utility vault, valve and manhole adjustments, AC milling, Type II aggregate base, permanent signing, striping, potable water improvements, valves, blow offs, landscaping, landscape irrigation, excavation, hauling, disposal, various removals, complete street elements, and various other improvements. This project is located in the City of Henderson, Nevada. Luke.Fritz@cityofhenderson.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT