Access the Full Project by Clicking here!
Bidjugde
JOB
San Jacinto Valley Raw Water Conveyance Facilities Phase 1 Pipeline
BID DATE
05/25/21 - 5:00
AGENCY
Eastern Municipal WD
ESTIMATE
$21,000,000
SCOPE
PREQUAL CONTRACTORS: CCL Contracting Contri Construction Co. J.F. Shea Construction, Inc. Kiewit Infrastructure West Co. OHL USA, Inc. dba Group OHL North America Steve P. Rados, Inc. Teichert Energy & Utilities Group, Inc. dba Teichert Utilities W.A. Rasic Construction Co., Inc. The work to be constructed is located along Esplanade Avenue east of Warren Road, south along Sanderson Avenue and east along Commonwealth Avenue to near Kirby Street in the Cities of San Jacinto and Hemet, California. The work comprises construction of approximately 11,050 linear feet of 60-inch diameter welded steel raw water pipeline, two 30-inch welded steel pipeline bypass connections, a 30- inch above grade suction header connection to the existing Commonwealth Booster Pump Station, a 30-inch above grade pipeline relocation of Hemet Water Filtration Plant 33-inch supply pipeline at Commonwealth Booster Pump Station, a 24-inch replacement of bypass pipelines in frontage of Hemet Water Filtration Plant, replace buried and non-buried manways, combination air valves, blow off assemblies, cathodic protection, isolation valves, demolition, fencing, trench repair and asphalt concrete overlay, traffic control, hydrostatic testing, pipe connections and all other appurtenances as shown or specified in the contract documents. zamoras@emwd.org
UPDATES