Access the Full Project by Clicking here!
Bidjugde
JOB
Fairfield Vacaville Train Station
BID DATE
09/30/14 - 2:00
AGENCY
Fairfield
ESTIMATE
$35,000,000
SCOPE
Train Station 1. 40’ x 800’ center island platform with amenities including shelters, lights, PA and VMS systems – constructed on UPRR property. 2. 20’ x 150’ pedestrian underpass with stairs and ADA ramp both north and south. 3. North plaza area with 6 bus bays and bus shelters. 4. South plaza area. 5. Plaza foundations near RR tracks built with 24-inch dia CIDH piles. 6. Three parking areas with lighting, drainage and landscaping. Roadways 1. Widening of Peabody Road to 6 lanes from Vanden to Huntington Road. 2. 1600’ pre-cast and cast-in-place 6-lane overpass over UPRR tracks with MSE walls and embankment. Bent and abutment foundations using 72-inch and 24-inch dia CIDH piles. Must be constructed from Summer 2015 to Summer 2016. 3. New 2-lane transit access road through station. 4. Extension of Vanderbilt road south to the new transit access road. 5. 20-ft wide temporary access road approximately 60 feet west of Peabody Road. 6. Street lights and landscaping. 7. Two new intersections with traffic lights and fiber optic interconnect. Civil Work for Trackwork 1. Grading and subballast for 6000 track feet that meets UPRR standards. 2. 36 inch diameter culverts and v-ditches. Carol Wolf carol.wolf@kkcsworld.com or Tom Martian tmartian@fairfield.ca.gov dfeinstein@fairfield.ca.gov.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT